Concrete Projects
Installation for the spaces you use every day
Concrete Canvas installs new pours and full replacements for patios, driveways, pool decks, walkways and other slabs. Finish choices include broom, pea gravel, rock salt, stamped and stained concrete, with grading, drainage and control joints considered as part of the work.
Patios and pool decks
Create a finished outdoor surface with practical texture, decorative patterns, color or a combination of options.
Driveways and walkways
Install or replace concrete with a broom finish, decorative border, stamped pattern or other selected finish.
Coordinated project work
Demolition, haul-off, base preparation, forming, pouring and finishing can be managed as one project.
Installation Process
Preparation supports the finished slab
Concrete performance depends heavily on what happens before the pour. The project may include demolition, grading, drainage planning, base preparation, reinforcement, forming and control joints, followed by finishing and sealing where specified. These details are especially important for DFW sites with expansive clay soil, slopes or water-management concerns.
Concrete Canvas Work
Built for patios, driveways and outdoor living
Concrete Canvas has poured and finished concrete across the Dallas-Fort Worth Metroplex since 2012. The team coordinates the project from site evaluation through final seal, with finish and layout choices based on the surface’s use, surrounding property and desired appearance.
Concrete Installation FAQs
Common Questions About Concrete Installation
What does a concrete installation project include?
Depending on the project, work can include demolition and haul-off, grading, drainage, base preparation, forming, reinforcement, pouring, finishing, control joints and sealing.
What finishes are available for new concrete?
Options include broom, pea gravel and rock salt finishes, along with stamped or stained concrete. The best choice depends on the surface, desired appearance, traction and use.
When can new concrete be used?
Concrete is typically safe for foot traffic in 24 to 48 hours and vehicle traffic after about seven days, with full cure taking roughly 28 days. Exact timing depends on project conditions.
Concrete Canvas